New: an honest review of the best logistics software for Indian steel manufacturers.

Read the guide
Who we serve

One record, tuned to your industry

Consumer brands run channels, couriers, and returns on it. Manufacturers run plants, dispatch, and freight on it. 3PLs run every client on it. Pick your vertical for the playbook, the proof, and the typical ROI.

Fretron’s rails were built where logistics is hardest — 1M+ shipments a year, ₹10,000 Cr+ freight orchestrated for India’s biggest manufacturers

VMartExideBrilliant PolymersVolvo SMLWelspunBajaj ExpressAmara RajaJindal Steel & PowerCenturyPlyNandan PetrochemJubilant Ingrevia

Manufacturers

Steel, cement, chemicals, automotive, EPC & building materials. Plant-to-customer dispatch, yard and weighbridge automation, freight procurement and billing — the freight depth Fretron was built on.

Manufacturing

Steel freight doesn't leak in the rate. It leaks between the gate, the weighbridge, and the invoice.

Optimize plant dispatches, reduce TAT, control freight costs, and track EXIM shipments for steel manufacturers.

8-15 Cr/year Recoverable Freight Savings 40 % Plant TAT Reduction 20 % OTIF Improvement
Manufacturing

Run 400 cement dispatches a day per plant — without drowning in phone calls

Cement logistics software for 400 dispatches/day per plant — dealer-window delivery, plant TAT reduction, and peak-season scale on one record.

40 % Plant TAT Reduction 30 % Placement Delay Reduction 98 % On-Time Deliveries
Manufacturing

Chemical and hazmat dispatch on one record — plant gate to ePOD

Dispatch planning, carrier documents, tracking and ePOD on one record for chemical manufacturers — tankers, drums and packed loads.

On-record Dispatch and delivery documents on the record Live Delivery windows tracked against the SLA clock Seconds A shipment's trail pulled from the record
Manufacturing

Automotive logistics that hits every OEM window — and proves every timestamp

Automotive logistics software for JIT component suppliers — hit OEM delivery windows, prove timestamps, avoid line-stoppage penalties.

40 % On-Time Improvement 3-5 Cr/year Penalty Avoidance 80 % Coordination Time Reduction
Manufacturing

EPC materials across 50 sites — without losing a single delivery window

Coordinate material deliveries across 50+ construction sites from 20+ vendors. Track every shipment, hold vendors accountable, prevent project delays.

15 % reduction in project delays Material delivery schedule adherence 40 % faster site deliveries Vendor coordination improvement 100 % ePOD coverage Digital proof at every site

Looking for your audience playbook?

Beyond per-industry detail, we’ve packaged Fretron for 3 primary buyer types — pick the one that matches your role.

See Fretron on your supply chain

Get a walkthrough built on your vertical’s flow — consumer brand, manufacturer, or 3PL.

Book a demo on your supply chain