Run 400 cement dispatches a day per plant — without drowning in phone calls
During peak construction season, demand spikes 40-60%. Plants that cannot scale dispatch coordination miss dealer windows and lose share. Your dispatch room turns into a war zone of phone calls, WhatsApp messages, and Excel sheets.
Fretron’s rails were built where logistics is hardest — 1M+ shipments a year, ₹10,000 Cr+ freight orchestrated for India’s biggest manufacturers











Common Challenges
How it breaks when every system holds its own truth.
Peak season dispatch collapse — shipments jump from 150/day to 350/day per plant in October. Excel-based dispatch teams start rejecting orders instead of planning.
Dealer delivery windows are narrow — construction sites need cement at 6 AM. A truck arriving at 10 AM means the crew sits idle. Dealers switch brands after 2-3 missed windows.
Vehicle placement delays cascade — when the first truck is late, the entire day's dispatch sequence breaks. One late placement creates 5-8 delayed deliveries.
Built for Cement
Cement logistics is a throughput game — the plant runs 24/7, dispatch has to match: packers, loaders, weighbridge, transporters, one sequence. One hour of placement delay cascades into gridlock; October demand jumps 40-60%, Excel-based teams start rejecting orders. Fretron runs the day on one record — indent to weighbridge to doorstep — so the truck makes its 6 AM window.
Key Capabilities
Every capability below reads — and writes — the same record.
Dispatch planning for peak season
Auto-indent allocation with packer and loader integration — volumes spike, the plan scales.
Plant & yard automation
Gate-to-gate TAT by stage — see if the bottleneck is weighbridge, loading, or quality.
Sequenced to the window
Loads planned around the dealer's window — the 6 AM slot made, not missed.
Freight billing, auto-reconciled
Billing tied to trip data — contract rates, variance flags, no month-end battles.
The exceptions, not every plant
The record flags a window slipping or a freight bill off contract.
Dealer & transporter portals
Dealers check delivery status and ePODs themselves; transporters self-report and upload documents.
Outcomes This Drives
400+
dispatches a day per plant — with the team that struggled at 250
40%
plant TAT reduction — faster turnaround, lower detention
98%
deliveries on time, inside dealer receiving windows
<1 week
billing reconciliation cycle, down from ~4 weeks
Frequently asked questions
How does Fretron help cement manufacturers optimize dispatch planning?
How does Fretron improve bulk and bagged cement logistics?
Can Fretron help manage return logistics and reverse haulage?
How does Fretron ensure compliance in cement transportation?
What makes Fretron different from other logistics solutions for cement companies?
Still have questions?
Talk to our teamOur credentials
₹10,000 Cr
Freight costs managed
1M+
Shipments handled every year
₹400 Cr
Saved in freight costs
100+
Enterprise clients
Also rated
Rated by the teams who run on it
Beyond the heritage numbers above, Fretron is rated by verified reviewers on G2 and Capterra — and the real proof is your own dispatches: in a demo we run one day of your plant's shipments on one record, plan to gate to dispatch.
See your plant’s dispatch on one record.
Bring one day of dispatches — we’ll trace them across your plants, carriers, and customers.
Book a demo on your dispatch flow